Facilities Division
Monday, October 13, 2008    
About Us Our Services Facilities Intranet Search Facilities BlazerNET UAB Home Page

  • Facilities Home
  • Facilities Management
    • Campus Maintenance
    • Central Utilities
    • Support Services
    • Hospital Maintenance
    • Elevator Maintenance
    • Financial
    • UAB Recycling
    • Energy Management
    • Human Resource Management



  • Send an E-Mail
  • Service Request Form




  • Home Page
  • "GOING GREEN" Awareness Campaign
  • Energy Conservation Tips
  • Office Energy Use
  • Staff Energy Conversation Tips
  • Student Housing Energy Conversation Tips
  • Facilities Green Partnership with School of Engineering
  • Construction "GREEN" Standards
  • Natural Gas & Electric Vehicles
  • Water & Sewage Reduction Program
  • Reducing Electrical Usage With
    More Efficient Lighting
  • Reducing Electrical Usage With
    More Efficient Motors
  • Energy Savings Mode for Computer Users
  • Reduction of Air Condition &
    Heating Energy Consumptions
  • Other Energy Management Links
  • Recycling
  • Greening of UAB Newsletter
    • September 2007
    • October 2007
    • November 2007



  • Delta-T Report Upload
  • Utility Services
  • Delta T-Report

 

 

Water & Sewage Reduction Program

 
  • Water Reduction Program

Water is a precious resource and UAB has a program underway to replace mechanical equipment that wastes water such as water sealed pumps and compressors.  Building examples: THT, BBRB, VH, Sparks, JT and QBT.  Most of these have already been replaced over the last several years.  We have another program to install condensate systems for steam boilers to recycle most of the water.  Building examples: Zeigler, WP, SWB, Russell, Boshell and MEB.   Conversion of cold rooms using domestic water to chilled water has been completed during the cold room updates. Building examples: LHRC, Sparks, THT, VH, Boshell and WTI.

  • Sewage Reduction Program

Unnecessary water streams previously discharged to sewage drains have been rerouted to storm drains. There are over 30 buildings this has been completed in. Building examples:  AB, CU, VH, YMFB, FAB, JT, BBRB, Bartow, HUC, WEBB, CRC, CH19, THT, WP Boiler and WTI Linear Accelerator, etc.  Kitchen grease is now being collected and recycled.  Building examples: JT, WP and SRC.


 
 

Mission and Vision

Guide to Services

Building Directory

Meet Our Employees

Service Request Form

Last revision: March 2, 2005 2:59 p.m.
Webmaster
UAB
Facilities Division
801 6th Ave. South
Birmingham, AL 35294
Copyright © 2004
UAB Privacy Statement